Saturday 14th March 2026
There was a turnout of 6 today and after an initial inspection and observation for any nesting birds we cleared the next section of about 40 metres of embankment
We would have done more but owing to the fact that future access to the site could possibly be denied to the team we conducted a quick tidy up so that the site was left tidy The cut material was all burnt and most of the logs were transferred to the bridge so that they could be collected. The team worked well in the time available and even though several expressed their unavailability for next week they hoped that we could finish the job.
Brummie Dave
Final state, clear down past the crab apple on a fantastic spring day
A few logs available just past the bridge


Comments
Post a Comment