Saturday 21st March 2026

There were as stated a team of 8 today so we were able to split into two teams of four.  The one group continued with the clearance at Mrs. Townsends whilst the other loaded the vehicle with the heap of wood chippings for use of mulching the relatively new trees that had been planted along the line.  This was an arduous task and had to be loaded via a single wheel barrow at a time . Our thanks to Lawrence who was not only our driver for the day but also our single power tool operator so he was kept very busy by the rest of the team members who went about their tasks with great determination.  A fire was lit to burn the cut material that at times was cut by the use of hand saws.  We have left an amount of cut material on the ground ready for disposal next week so we plan to continue with that.

Before work commenced the area was checked for nesting birds of which none were found but we did observe a robin and blackbird on the ground with several swans flying overhead. There were 3 red kites circling in the distance but no signs of nesting.  It was a beautiful day and it was good to be together.  Some of the team will be undergoing brushcutter training during the week so best wishes to them.

BRUMMIE DAVE

End of day picture




Comments

  1. Well done to the 'unsung heroes'. The result looks wonderful. If only the National railway would copy this. I live close to the Par to Newquay line, and other thanurgent cutting back, the lineside could quite easily be used for Hallowe'en.
    Regards, Paul.

    ReplyDelete

Post a Comment

Popular posts from this blog

Saturday 7th March 2026

Saturday 28th March 2026