Saturday 28th March 2026

We ended  our days session with a team consisting of 8 persons working.  They brush cut a strip along then remaining fence line (about 120 metres long by 3 metres wide) between the bottom of the embankment and the adjoining meadow.  Whilst this was being done the next section of the embankment was cut back after the necessary checks were done for nesting birds.  All this was time consuming as each check lasted about half an hour

Most of this area consisted of thick blackthorn mixed with brambles and all this had to be disposed of to leave the site tidy.

Two fires were needed to get rid of the dross so the team was kept busy.  An additional task that was requested of the team was to move the piles of logs from their position so that our contractors could install new fencing during the coming week.  This late task required the team to divert from the clearance and served as a public relations task towards our neighbouring land holder who has been very tolerant towards the team and helped with parking and access to the embankment.

Another great days work.
Brummie Dave

Yet another passing train




End of day pics




Work in Progress




Comments

Popular posts from this blog

Saturday 7th March 2026

Saturday 21st March 2026