Saturday 18th April 2026
Five of us today, Alex, Andy, Dick, Katrina and I.
We worked between Cheltenham Racecourse Signal box and Southam Lane Bridge.
In no specific order:
- Cleared under the signal wires from the box to each signal and same for point rodding.
- Cleared back the paths for the foot crossings
- Removed a few ash and elder saplings
- Cleared around the SW sign for the RDA crossing.
- Cleared back the blackberry at RDA.
We did see Railcar 22 leave Cheltenham as we arrived.
A few photos attached and so we can complete the set, also one of 22 at Winchcombe this afternoon with absolutely no editing to remove signals, houses or make it black and white (honest).
A work to log for C&M the fence alongside the path on the Malvern side for the Cheltenham foot crossing needs replacing from the line down to the foot of the embankment.
There also appears to be a fresh badger set between the RDA crossing and Southam Lane Bridge on the RDA side.
Graham