Wednesday 29th April 2026

 Just 2 of us today.

 

Exceptional working with a team of two as there was a defect report to action and as we were working between Toddington Signal Box and Station it would have been easy to obtain help, had it been required.

 

The defect report was from the signalmen who could no longer see the down starting signal at the south end of platform 2. We dealt with the overhanging branches and saplings that were blocking their view and left with the signalmen happy.  We also cleared the strip from the end of platform 2 to the signal box. The arisings were used to create small lengths of dead hedge in gaps by the fence, which should be a deterrent to trespass that has occurred in this area.

 