Great work today by the team in warm conditions at Gotherington.

Alex and I set worked from the distant signal in Dixton cutting back to Gotherington clearing any plants from underneath the signal wire.

Dick cleared the dead broken branch from the last pine at Gotherington. Sally worked along the fence line by the path to the station clearing.

Sally and Dick also cleared the weeds from the signal wires and point rodding from Gotherington station back to the signal box.

Andy, Paul, Lawrence and I set about brushcutting both the Cotswold and Malvern sides of the line from Gotherington to Granna Lane Bridge. Assisted by Alex on fuel and look out duty.

All the above was completed by 2pm when we packed up and headed home for a well earned cold drink.