Wednesday 19th August 2026

5 of us yesterday. 

With 4 brushcutters we made good progress completing the ditch clearance at Winchcombe and then continuing northwards alongside the carriage sidings. We also partially cleared a further ditch that is slightly further east, starting just after the main ditch disappears into a pipe. There doesn’t seem to link to the main ditch and it appears to peter out as we cleared southwards and then drop steeply into a heavily wooded area northwards. We have probably cleared as much as we can without taking on a major task. Arisings were dealt with by raking up and then mulching using a brushcutter, with a mulching blade, to leave the cut areas tidy.

 

First thing in the morning two of us went to the southern end of Stanway Viaduct to improve visibility of the 25mph sign, which drivers had raised as a defect report. We partially cleared a small ash tree and also some bramble. Our efforts were to the satisfaction of a passing class 37 driver, so this defect report can be ticked off. In order to future proof the visibility it would be worthwhile taking out the ash tree at some point. Whilst we in this area we tidied up the vegetation growth around the adjacent mileage sign.

 

A couple of pictures at Stanway are attached, courtesy of Brian.

 

David M


  


Comments

Popular posts from this blog

Saturday 7th March 2026

Saturday 4th July 2026

Saturday 23rd May 2026